Trim work is almost finished in the house. The only thing left are the base boards on the 1st floor. Matt and John have started the stair project and it's looking great!
Upstairs bedroom with trim
Upstairs trim
Bear print in the driveway! Yikes!
Trim on floor at the top of the stairs (Matt and John started today)
It will soon have railing and balusters!
Same trim, we'll stain it after it's down.
Hand rail and stair trim
From the top
Swannanoa Sunset
No comments:
Post a Comment